Footings on Reactive Ground
Stiffened rafts, waffle rafts, strip and piered footings designed to the site classification. The section shown is a stiffened raft on reactive clay, with internal beams positioned to the loads above.
Capabilities
From a volume builder's standard house to an architect's cantilevered residence, these are the structures we design, shown as the sections and elevations an engineer actually works from. Premium engineering, delivered within your budget.
Stiffened rafts, waffle rafts, strip and piered footings designed to the site classification. The section shown is a stiffened raft on reactive clay, with internal beams positioned to the loads above.
Steel and timber beam design for new builds, extensions and renovation works, across every structure type rather than houses alone. Member sizing, bearing and connection details, and the load path traced down through posts to footings sized for concentrated load. Deflection limits usually govern, not strength.
Walls carrying driveways, structures and pools above them. Drainage, embedment and global stability are designed together, because a wall that can hold itself up can still slide.
Footprint, levels, setbacks and stormwater coordinated on one plan, drawn to what councils assess against.
Boreholes logged against the proposed footprint, laboratory testing, and characteristic surface movement calculated to give a defensible site classification.
Layouts and member sizing where spans, rakes or cantilevers put the structure beyond standard span tables, including bracing and tie-down.
Certification of framing designed elsewhere, hot-rolled portal frames and cold-formed light-weight framing alike. Light-gauge wall frames, joists and trusses are checked to AS/NZS 4600 and the NASH Standard (the national code for cold-formed steel framing), not the hot-rolled rules. Uplift usually governs, and the tie-down chain from sheeting through to footing is the part that decides whether the structure stays put.
Reinforced shells designed for the site, including pools on fill and pools whose loads interact with a nearby retaining wall or footing.
Reinforcement, cover and setout checked while they can still be corrected, with the report issued to whoever booked the inspection.
Our standard
Every set we issue is coordinated with your architectural drawings and detailed so a builder can set out from it without ringing to ask. That is the premium part. The fee is set to sit within your budget, and it is fixed in writing before any work starts.
Send the site and the scope and we'll tell you what it needs.
Get a quote Call 0451 254 256